Industrial Boulevard, from 500 feet on either side of the bridge to the pump station canal, will be closed to all traffic from 10-26-09 through 11-02-09.
This is necessary for the contractor to make the connection across Industrial Blvd. Roadway for the new levee system. Industrial Boulevard will also be closed to through traffic, and will be detoured by way of South Van Avenue and Grand Caillou Road.
For more information contact: Byron Talbot Contractor, Inc. at 985-447-5764.
Wednesday, October 14, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment